Located in the Barra da Tijuca neighborhood, the Olympic Park was the main venue for the 2016 Summer Olympics. We supplied materials and developed more than 50 concrete mixes, totaling 180,000 cubic meters—the equivalent of more than 22,000 loaded ready-mix trucks.